Which factory will make our order?
The production location is confirmed after reviewing process, suitable tooling, capacity and project-specific quality requirements.

OEM/ODM · Manufacturing network
Three family-operated factories at different locations provide overlapping capabilities. RubbLink coordinates the buyer interface while the actual route is confirmed by product, tooling, process and capacity requirements.
Buyer questions
The production location is confirmed after reviewing process, suitable tooling, capacity and project-specific quality requirements.
No. Website evidence represents the network. Relevant machines, tooling and the final factory address are verified for the actual project.
Depending on the route, preparation may include controlled weighing, internal mixing, open milling and sheeting or preform work.
Project-relevant photographs, live video or a scheduled visit can be arranged once the likely factory and production stage are known.
Real factory evidence
Capacity is more useful when connected to a specific route than when presented as an unsupported factory number.

Preparation
The selected formulation begins with measured material inputs before mixing and downstream preparation.

Compounding
Mixing, open milling and sheeting prepare material for the production method and selected tooling.

Molding
The operator, mold, material and process settings come together after the sample baseline is approved.
Project workflow
Match the specification with tooling, process, capacity and location.
Approve the material, drawing, sample and packing requirements.
Use agreed in-process and final checks against the approved reference.
Confirm packing, documents, Incoterm and handover with the buyer or forwarder.
Explore the evidence
From sample or drawing to measurable tooling and approval criteria.
Review capabilitySee how material, tooling and process determine the production route.
Review capabilityDefine the baseline, inspection method and evidence required by the project.
Review capability